900 barrels of water line packed to Jordan 2023/12/7
December 7, 2023
On 7 December 2023, we arranged for 900 barrels to be line packed to Jordan.
-
Water Source and Treatment:
- Identify a clean and reliable water source.
- Implement water treatment processes to ensure the water meets quality standards.
-
Barrel Manufacturing:
- Produce or source 900 barrels to hold the water.
- Ensure the barrels meet regulatory and safety standards.
-
Filling Station:
- Set up a filling station with equipment capable of filling 900 barrels with water.
- Implement quality control measures to ensure accurate filling and prevent contamination.
-
Capping and Sealing:
- Install equipment to cap and seal the barrels securely to maintain the water quality.
-
Labeling and Packaging:
- Develop labels with necessary information (brand, expiration date, etc.).
- Implement a packaging system to prepare the barrels for distribution.
-
latest company news
-
2 Jan, 2024
-
2 Jan, 2024
-
7 Nov, 2023
-
2 Nov, 2023
-
10 Oct, 2023
Mail Us -