On August 2, 2023, we arranged for the carbonated line to be packed to Russian.

August 2, 2023

Latest company news about On August 2, 2023, we arranged for the carbonated line to be packed to Russian.

Bottle washing process: the bottle enters the washing machine, the inner and outer surfaces of the bottle are cleaned, and the dirt and foreign matter are removed. Bottles are inspected to exclude broken or defective bottles. The cleaned bottle goes to the next step.

 

Filling process: bottles enter the filling machine, automatically positioned and aligned. The filling device accurately fills the carbonated beverage into the bottle according to the preset filling capacity. Carbonation gas may be injected during the filling process, giving the beverage a fizzy effect. After the filling is completed, the bottle goes to the next step.

 

Cap closing process: the bottle enters the capping machine, and the cap or cap is automatically installed. After the bottle cap is closed, the bottle goes to the next step.

 

Labeling process: the bottle enters the labeling machine, and the label containing product information, brand logo, etc. is automatically attached.

 

Finished product packaging process: bottles enter the packaging machine for packaging operations, such as boxing, labeling, etc. After packaging, the finished carbonated beverage exits the production line, ready to be shipped to the market.

 

The main features of the carbonation production line are high automation, efficient production and reliability. Such a production line can improve production efficiency, reduce labor costs, and ensure product consistency and quality. At the same time, through the intelligent control and monitoring system, the production process can be adjusted and corrected in real time to ensure accurate filling and packaging of products. This makes the carbonated production line an important equipment in the carbonated beverage production industry, providing manufacturers with high-quality, high-yield production solutions

latest company news about On August 2, 2023, we arranged for the carbonated line to be packed to Russian.  0

latest company news about On August 2, 2023, we arranged for the carbonated line to be packed to Russian.  1

latest company news about On August 2, 2023, we arranged for the carbonated line to be packed to Russian.  2

ZhangJiaGang City fillpack Machinery Co., Ltd., customized equipment according to customer needs, to solve the water problem.

Our company specializes in providing a complete set of water filling equipment, bottled water filling and packaging production line for the water plant,Water plant construction, workshop planning, equipment selection, installation and commissioning.