2500BPH Capacity 5L Bottle Drinking Water Filling Plant with PLC Control
Product Details:
Place of Origin: | ZhangJiaGang JiangSu China |
Brand Name: | FILL PACK |
Certification: | CE & ISO & TUV & SGS |
Model Number: | CGF 18-18-6B |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD $35000-$38000/set |
Packaging Details: | Wooden Case |
Delivery Time: | 30 Working Days After Receiving Deposit Payment |
Payment Terms: | T/T, L/C, D/A, D/P, , MoneyGram |
Supply Ability: | 10 Sets Per Months |
Detail Information |
|||
Type: | 3 In 1 Monoblock | Bottle Size: | 3-5L |
---|---|---|---|
Production: | 2500BPH | Processing: | Japan & Germany |
Material: | SUS304/316 | Application: | Commercial |
Highlight: | 5l Drinking Water Filling Plant,plc Drinking Water Filling Plant,2500BPH Drinking Water Filling Plant |
Product Description
2500BPH Capacity 5L Bottle Drinking Water Filling Plant with PLC Control
Product description:
1.This bottle filling plant is used in production of mineral water packed in polyester bottles. Washing, filling and capping are integrated in one machine. The production capacity is about 2500 bottles per hour.
2.Using spring cramps in the bottle washing process. The empty bottles can be turned over 180~ along the conveying rail. There are two times of internal and external washing. It has a high efficient washing function.
3.The filling by spring type liquid lever controlling filling valve, no dripping. The liquid lever is easy to control. All construction made of SUS304, There is no dead corner inside filling valve.
4.The magnetic torque is used for screw capping. The power of screw capping can be adjusted without steps. The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
5.The frequency changing technology is used to adjust the operation speed sleeplessly. The production capacity can be displayed digitally and can be adjusted conveniently.
6.There is electrical heating cold-heat tank enclosed in the whole system especially for keeping hot filling temp during hot juice filling. And it can also be stopping heating by easy electrical break down for cold water filling. It do not need extra steam system to work together.
Parameter:
Model | CGF18-18-6B |
Rinsing Head No. | 18 |
Filling Head No. | 18 |
Capping Head No. | 6 |
Rated Capacity
|
2500-3000BPH |
Overall Size |
2450*1900*2300mm |
Weight | 3.0T |
Power(KW) | 4.0kw |
Rated Voltage | Customized |
The filling part:
1) The rotate plate is made of SUS AISI304, large flat toothed bearing.
2) Adopted Germany anti-corrosion non-maintaining bearing that can reduce the pollution of filling to the environment.
3) The pressure mechanical valve is introduced the advanced foreign design with a fast filling speed, no hygiene corner pocket, a few sealing parts, and precise liquid level control. The whole valve is made of 304 stainless steel.
4) The filling system has a CIP circulation system to wash the pipeline and fake-cup used for cleaning filling valve. This system can clean the liquid pipe, liquid tank and filling valve etc. effectively.
5) This filling system has an automatic temperature control system.
6) The filling valve opens and begins filling when it moves down and touches the bottleneck, the filling valve move up and leave the bottleneck when it finishes filling.
7) The liquid supply adopts the automatic pneumatic valve magnetic liquid-level switch to control the liquid tank automatically. And the motivation of the filler is derived from the driven system in the framework and passed by gear.
1.installation&commissioning
After the equipment arrived at the customer's site. the customer is responsible for unpacking and arranging the equipment according to the placement drawing;Our technician will do equipment set up and commissioning,buyer should offer necessary help if needed
2.Training
We are responsible for offering the technical training to user.Through training,users' technical staff can grasp and the skill of operation and maintenance proficiently.The buyer also can send staff to our company for learning.
3.Quality assurance
The warranty period is 12 months after acceptance chech of the production line.if there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract.
please kindly click the play button to watch the video