Mineral / Pure Drinking Water Ion Exchanger / Precision / Cartridge Purification Equipment / Plant / Machine / System
Product Details:
Place of Origin: | ZhangJiaGang City, JiangSu Province, China |
Brand Name: | FillPack |
Certification: | CE,ISO |
Model Number: | Filter-FRP |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set/pcs |
---|---|
Price: | Negotiation |
Packaging Details: | Blanket cloth or wooden case pacakge |
Delivery Time: | 15-20 days |
Payment Terms: | L/C, D/A, D/P, T/T, , MoneyGram |
Supply Ability: | 50 sets/month |
Detail Information |
|||
Materials: | Fiber Reinforced Plastic (FRP) | Color Available: | White, Blue Or Customized |
---|---|---|---|
Usage: | Pure Water Process | Testing Pressure:: | 0.9Mpa (150psi) |
Highlight: | water ro system,ro water purifier machine |
Product Description
Description of our FRP Mechanical pre-filters of water treatment system
Application:
pre RO, Ion Exchange, Water softener, waster filtration, House hold water filtration, Food and beverage, water storage
Opening:
2.5”~4” UN threads ABS opening;
6” Flange FRP;
other customized manway and side flange
Advantage:
Good corrosion resistance
High mechanical strength at low specific gravity
Good resistance to weathering
Light weight
Good insulating qualities
Provide less maintenance & repairs down time
Easy installation
Mineral / pure drinking water ion exchanger / precision / cartridge purification equipment / plant / machine / system
Structure Instuctions:
1, Backwashing:
When the filter runs to a certain time, there are more impurities in the tank. The filter needs to be backwashed. When backwashing, the exhaust valve 5, the upper exhaust valve 7 and the lower inlet valve 8 are opened, the upper inlet valve 6 and the outlet valve 2 are closed, and the water flows out from the lower outlet 3. Backwashing flow generally controls the filter material not to be washed out, generally about three times the operation time. Backwashing ends when the transparency of the incoming and outgoing water is similar.
2, Positive washing:
After backwashing, close the lower inlet valve 8, the upper exhaust valve 7 and the outlet valve 2, open the upper inlet valve 6 and the lower exhaust valve 9, and start the positive washing of the filter material. The positive washing flow rate is the running flow rate, and the time is usually 10-20 minutes. When the effluent is clear and transparent, the equipment can continue to be put into operation.
Parameters of our FRP Mechanical pre-filters:
The FRP Mechanical pre-filters are matched with water treatment:
Model | Size | Used for Water treatment machine |
818 | 200X450 | 0-100LPH |
835 | 200X 875 | 100-250LPH |
844 | 200X1100 | 100-250LPH |
942 | 200X1050 | 250-500LPH |
1035 | 250X875 | 250-500LPH |
1054 | 250X 1350 | 250-500LPH |
1252 | 300X 1300 | 500-1000LPH |
1354 | 325X 1350 | 1000-1500LPH |
1465 | 350X 1625 | 1000-1500LPH |
1665 | 400X1625 | 1500-2000LPH |
1865 | 450x1625 | 2000-2500LPH |