Multifunction 8 Heads Drinking Water Bottle Filling Plant 800BPH For 5L Bottle
Product Details:
Place of Origin: | ZhangJiaGang JiangSu China |
Brand Name: | FILL PACK |
Certification: | CE & ISO & SGS & TUV |
Model Number: | XGF 8-8-1 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 set |
---|---|
Price: | USD $11000-$18000/set |
Packaging Details: | Wooden Case Packaging |
Delivery Time: | 30 Working Days After Receiving Deposit Payment |
Payment Terms: | T/T, L/C, D/A, D/P, , MoneyGram |
Supply Ability: | 10 Sets Per Months |
Detail Information |
|||
Condition: | New | Application: | Drinking Water |
---|---|---|---|
Driven Type: | Full Electric Automatic | Processing: | Japan & Germany |
Capacity: | 800BPH | Bottle Kind: | 3L-10L PET Bottle |
Highlight: | water filling equipment,liquid filler machine |
Product Description
Multifunction 8 Heads Drinking Water Bottle Filling Plant 800BPH For 5L Bottle
Description:
Drinking water filling machine integrates flushing, filling and capping, and operates automatically in the whole process. It is mainly suitable for flushing, filling and sealing of non-gassy beverages such as mineral water and pure water. Most of the electrical system parts of this machine are made of advanced foreign products. All the places contacted with liquid materials are made of high-quality stainless steel. The main key parts are precisely machined by CNC machine tools. The whole machine is photoelectric to detect the operation status of each component. No bottle is filled, no bottle is capped, high automation, simple operation, wear-resistant, stable, low failure rate and so on. Product quality is at the forefront of the industry, which is the best choice for new and old beverage investors.
Details:
1. The rinsing part:
The bottle-punching machine is connected with the empty bottle conveyor rack. When the empty bottle enters the bottle-punching machine, the solenoid valve is ordered to move through photoelectric induction and circuit control system. The cylinder clamps the bottle and pushes the cylinder to work. The bottle mouth is down. Then the pure water pump opens and sprays pure water into the bottle. After 8 seconds, it stops. The push cylinder is reset, the bottle enters the conveyor, and then enters the filling machine.
2. The filling part:
After cleaning, empty bottles are transported into the filling machine. Two brush barrel cylinders are operated beside the conveyor. Then the bottle enters the filling part. The bottom part of the bottle opens on the conveyor belt. After filling, the bottle on the conveyor belt falls down and enters the sealing part.
3.The capping part:
Cap screwdriver has one head. After filling, the bottle is transported to the cap screwdriver station. The cap is screwed through the cylinder, and the finished bottle is exported to the warehouse again and again.
After sales service and training:
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
please kindly click the play button to watch the video